ArchivesNews

Maha Energy AB spuds Glaze 11-5 well onshore Illinois Basin, USA

Maha Energy AB (publ) (“Maha” or the “Company”) is pleased to announce the spudding of the Glaze 11-5 oil production well onshore USA.

On March 1st Maha begun drilling the Glaze 11-5 well using Les Wilson Drilling’s Rig #22 in the Illinois Basin (“IB”). This 4,000’ vertical well is located in the heart of the Mississippi Lime play in IB targeting several stacked pay layers. The Glaze 11-5 is expected to take about one month to drill and fully stimulate. Stimulation fluid flow back is expected to take another two weeks before the well can be placed on production. Initial productivity of this well is expected between 50-70 BOPD when brought on production during the second quarter of 2022.

Maha Energy AB, through its subsidiaries owns and operates a legal and beneficial 75% Working Interest (WI) in the SES-107D Block (Tartaruga) onshore Sergipe State Brazil, a 99% WI in the LAK Ranch heavy oil field in Wyoming USA, a 100% Working Interest (WI) in the Tie Field onshore Bahia State Brazil, an initial 100% WI in the Block 70 Mafraq field under the Exploration and Production Sharing Agreement with the Government of Oman and approximately 96% WI in the acreage in the Illinois Basin.

The information was submitted for publication, through the agency of the contact person set out below, at 08:30 CET on 2 March, 2022.

For more information, please contact:        
Jonas Lindvall (CEO)
Tel: +46 8 611 05 11      
jonas@mahaenergy.ca

Victoria Berg (Investor Relations)
Tel: +46 8 611 05 11      
victoria@mahaenergy.ca

About Maha
Maha Energy AB (publ) is a listed, international upstream oil and gas company whose business activities include exploration, development and production of crude oil and natural gas. The strategy is to target and develop underperforming hydrocarbon assets on global basis. Maha operates four oil fields: Tartaruga and Tie in Brazil, Powder River (LAK Ranch) and Illinois Basin in the United States.The shares are listed on Nasdaq Stockholm (MAHA-A). The head office is in Stockholm, Sweden with a technical office in Calgary, Canada, as well as operations offices in Grayville, Illinois, USA and Rio de Janeiro, Brazil. For more information, please visit our website www.mahaenergy.ca.

Maha Energy AB har påbörjat borrning av brunnen ”Glaze 11-5” i Illinois Basin, USA

Maha Energy AB (publ) (“Maha” eller “Bolaget”) meddelar att borrning inletts för olje-produktionsbrunnen ”Glaze 11–5” i Illinoisbassängen, i USA.

Den 1 mars påbörjade Bolaget borrningen av ”Glaze 11–5” med ”Les Wilson” borrigg nr.22 i Illinois Basin (”IB”). Denna 4 000 fot vertikala oljebrunn ligger i centrum av “Mississippi Lime” formationerna och inriktar sig på flertalet staplade lager av oljebärande kalkstenslager. Färdigställandet av borrning och stimulation förväntas ta omkring en månad. Rensning av stimuleringsvätskor förväntas ta ytterliga två veckor innan olja kan börja omhändertas ur brunnen. Initiala produktionsvolymer för denna brunn räknas att hamna på omkring 50–70 BOPD och förväntas ske under det andra kvartalet 2022.

Genom dotterbolag äger och styr Maha Energy AB, 75 procent av intresseandelarna i SES-107D Blocket (Tartaruga) onshoredelstaten Sergipe, Brasilien,  99 procent av intresseandelarna i LAK Ranch tungoljefältet i Wyoming, USA, 100 procent av intresseandelarna i Tie-fältet onshoredelstaten Bahia, Brasilien, 100 procent av intresseandelarna i Block 70 Mafraq som styrs av ett produktionsdelningsavtal med den Omanska Staten samt cirka 96 procent av intresseandelarna i ett flertal oljeproducerande fält och formationer i Illinois Basin, USA.

Övrigt  

Informationen lämnades, genom nedanstående kontaktpersons försorg, för offentliggörande den 2 mars 2022, kl.08:30 CET.

För mer information, kontakta:        
Jonas Lindvall (CEO)
Tel: +46 8 611 05 11        
jonas@mahaenergy.ca

Victoria Berg (Investor Relations)
Tel: +46 8 611 05 11      
victoria@mahaenergy.ca

Kort om Maha

Maha Energy AB (publ) är ett listat, internationellt uppströmsolje- och gasbolag vars affärsverksamhet inkluderar prospektering, utveckling och produktion av råolja och naturgas. Strategin är att inrikta sig på att utveckla underpresterande kolvätetillgångar på en global basis. Maha är verksam på fyra oljefält, Tartaruga- och Tiefältet i Brasilien samt LAK Ranch och Illinois Basin i USA. Bolagets aktier är listade på Nasdaq Stockholm (MAHA-A). Bolagets huvudkontor ligger i Stockholm, Sverige. Bolaget har även ett tekniskt kontor i Calgary, Kanada, samt operativa kontor i Grayville, Illionis, USA och i Rio de Janeiro, Brasilien. För mer information, vänligen besök vår hemsida www.mahaenergy.ca

Maha Energy AB meddelar resultat för fjärde kvartalet 2021 och inbjudan till webcast

Maha Energy AB (publ) (“Maha” eller “bolaget”) presenterar resultatet för fjärde kvartalet 2021. Rapporten är bifogad i detta pressmeddelandet och finns även tillgänglig på bolagets hemsida  www.mahaenergy.ca.

Fjärde kvartalet 2021

  • Genomsnittlig dagsproduktion av olja och gas för det fjärde kvartalet 2021 var 3 098 fat oljeekvivalenter per dag (BOEPD) (Q4 2020: 2 738 BOEPD)
  • Intäkter om 17,8 miljoner USD (Q4 2020: 8,7 miljoner USD)
  • Rörelsens netback uppgick till 11,9 miljoner USD eller 42,37 USD per fat oljeekvivalenter (BOE) (Q4 2020: 4,2 miljoner USD eller 17,66 USD per BOE)
  • EBITDA om 12,7 miljoner USD (Q4 2020: 2,7 miljoner USD)
  • Periodens resultat uppgick till 5,6 miljoner USD (Q4 2020: -15,7 miljoner USD)
  • Vinst per aktie före utspädning om 0,05 USD (Q4 2020: -0,15 USD)
  • Vinst per aktie efter utspädning om 0,05 USD (Q4 2020: -0,15 USD)
  • Efter räkenskapsårets utgång meddelade Bolaget att resultatet från 24-timmarstestet på Tie-4-brunnen uppgick till 4 400 BOPD och 1 766 MSCFPD, med användande av en elektrisk nedsänkbar pump (ESP).
  • Den 25 januari 2022 påbörjades borrningen av den horisontella brunnen Tie-5 Agua Grande (AG) i Brasilien.

Helåret 2021

  • Genomsnittlig dagsproduktion av olja och gas för 2021 var 3 387 BOEPD (2020: 3 301 BOEPD)
  • Intäkter om 68,3 miljoner USD (2020: 39,0 miljoner USD)
  • Rörelsens netback uppgick till 46,1 miljoner USD eller 38,18 USD per BOE (2020: 23,5 miljoner USD eller 20,06 USD per BOE)
  • EBITDA om 44,8 miljoner USD (2020: 18,1 miljoner USD)
  • Årets resultat uppgick till 19,8 miljoner USD (2020: -10,3 miljoner USD)
  • Vinst per aktie före utspädning om 0,18 USD (2020: -0,10 USD)
  • Vinst per aktie efter utspädning om 0,18 USD (2020: -0,10 USD)
  • Likvida medel om 25,5 miljoner USD (2020: 6,7 miljoner USD)

Finansiell information i sammandrag

(TUSD, om ej annat anges) Q4 2021 Q3 2021 Q2 2021 Q1
2021
Q4
2020
Helår 2021 Helår
2020
Dagsproduktion, netto (BOEPD) 3 098 3 610 3 104 3 742 2 738 3 387 3 301
Intäkter 17 818 19 496 15 178 15 814 8 659 68 306 39 018
Rörelsens netback 11 913 13 568 9 548 11 031 4 247 46 060 23 523
EBITDA 15 615 12 909 8 988 10 213 2 720 47 725 18 104
Periodens resultat1 7 363 6 083 2 603 5 538 (15 702) 21 587 (10 259)
Vinst per aktie – före utspädning (USD) 0,06 0,05 0,02 0,05 (0,15) 0,19 (0,10)
Vinst per aktie – efter utspädning (USD) 0,06 0,05 0,02 0,05 (0,15) 0,19 (0,10)
Likvida medel 25 535 31 778 34 139 5 698 6 681 25 535 6 681

Brev till Aktieägare

Kära vänner och aktieägare i Maha Energy AB,

Tie-4 – 4 695 BOEPD

Efter omfattande problem i Tie-4-brunnen vid försöken att få den till en horisontell produktionsbrunn i Agua Grande-reservoaren tog vi beslutet att konfigurera brunnen till en vertikal produktionsbrunn. Så snart brunnen var igenpluggad och sidoborrad så gick det snabbt att nå ett totalt djup om 2 221 meter den 17 december 2021. De initiala riggbaserade produktionstesterna gav tidigt en indikation om vad vi kunde förvänta oss, och när den nya elektriska nedsänkbara pumpen (ESP) startades blev det snart uppenbart att Tie-4 skulle bli en rekordbrunn för Maha. Det är den bäst producerande brunnen under vår korta historia och i Brasilien rankas den som den tredje bästa brunnen som borrats på land i Brasilien. Faktum är att under testning av Tie-4-brunnen behövde vi temporärt stänga ner alla brunnar utom en för att kunna hantera de stora volymerna som kom från brunnen.

Niclas Biornstad, Mahas produktionschef i Brasilien skrattade och berättade: ”Vi hade ett litet vad på produktionsanläggningen om vem som bäst kunde estimera produktionsnivån på Tie-4 innan vi startade den nya ESP:n. En av våra operatörer, Ronald Santos, var närmast med  sin gissning på 3 600 BOEPD.”

 

ESP:n, som är Mahas första på Tiefältet, gick på en tredjedel av dess potential vilket indikerar att det finns mer produktion att hämta. Men med en nivå om 4 695 BOEPD testades produktionsanläggningens kapacitet till sitt fullo.

   

Tie-4 är nu permanent ansluten till produktionsanläggningen på Tiefältet och producerar enligt plan. Alla brunnar är tillbaka i produktion och fältpersonalen är i full färd med att balansera produktionen från alla sex produktionsbrunnarna.

Tiefältet

GTE-3-brunnen kommer att behöva genomgå renoveringsarbete för att åtgärda en rörläcka. Brunnen kommer att färdigställas med en ESP vilket möjliggör högre produktionsvolymer jämfört med en hydraulisk jetpump. En nackdel med ESP är dock att om den går sönder så måste man mobilisera en rigg för att kunna åtgärda skadan, vilket är dyrt och tar tid.

Tie-3-brunnen konverteras nu till en vatteninjiceringsbrunn för att upprätthålla nödvändigt reservoartryck, vilket påverkar oljeproduktionen positivt och reducerar gasproduktionen från fältet. Vatten- och gasinjektorn ALV-2 behöver sedan ett rörbyte för att kunna hantera återinjicering av gas.

Ovan planerade renoveringsarbeten och den planerade anslutningen av Tie-5-brunnen kommer att påverka produktionsvolymerna på Tiefältet under 2022.

Tie-5 – en viktig horisontell brunn

Borrningen av Tie-5-brunnen påbörjades den 25 januari 2022 och borras för närvarande i 12-1/4” hålet. Vi har gjort väsentliga designförändringar av brunnen för att adressera de borrproblem som uppstod då Tie-4-brunnen borrades. Väsentliga förändringar inkluderar djupare sättning av 9-5/8” röret och borrning av den problematiska Lower Candeias i en kortare sektion samtidigt som vinkeln hålls under 60°. Tie-5 kommer också att färdigställas med en ESP-pump.

Tie-5-brunnen förväntas färdigställas under andra kvartalet i år och kommer att ge en väsentlig reservproduktionskapacitet till Tiefältet. Den 500 meter horisontala brunnen kommer att nå upp till fyra gånger mer olja än en konventionell vertikal brunn. Än viktigare är att den kommer att fungera som en ”reservtank” för fältet så att produktionsnivån kan upprätthållas om en brunn behöver stängas för renovering.

Oman

Vårt Mafraqteam har varit engagerat i att köpa in material och tjänster för det kommande borrprogrammet i Oman. För tillfället utvärderas tre borriggar i syfte att kunna påbörja borrning någon gång under andra kvartalet 2022.

Illinoisbassängen

Vid våra Illinoisbassängtillgångar har Hayden Ott och hans team arbetat med att ansluta alla brunnar som borrades under tredje kvartalet till produktionsinstallationer. I slutet av 2021 hade alla brunnar anslutits och alla brunnar förutom en producerade olja. Produktionsnivåerna är i princip som förväntat och trots att fem brunnar tog längre tid än förväntat att avvattna är den genomsnittliga produktionsvolymen 476 BOPD hittills under februari. På den sista brunnen, Ford-35-3, har en pump anslutits och den visar nu också tecken på oljeproduktion.

Även om oljepriset lockar till att borra flera brunnar i Illinoisbassängen kommer vi att utvärdera produktionsresultaten från de tolv brunnar som vi borrade under 2021 innan vi fattar beslut om fortsatt utveckling under 2022. Den första av de två brunnar som vi har åtagande att borra kommer att borras under första kvartalet 2022. Den andra, en joint venture-brunn, kommer att borras lite senare, beroende på när en rigg finns tillgänglig.

Sedan oljepriskollapsen 2014 och den efterföljande pandemin under 2020/21 har oljeindustrin tagit mycket stryk. Investeringarna i industrin har minskat och då efterfrågan fortsätter att öka i oförminskad takt, trots starka röster om energiomställning, råder nu underskott av olja och gas i världen. Maha är väl positionerat för att kunna leverera fler fat och mer gas i takt med att efterfrågan fortsätter att öka. Maha har gått från 1 000 BOEPD i 2017 till 4 275 BOEPD i januari 2022 – och det under en pågående pandemi. Med Oman, där cirka hälften av bolagets framtida reserver och resurser finns, är vi väl positionerade att fortsätta växa.

Slutligen vill jag tacka alla medarbetare på Maha som oförtrutet jobbar för oss alla, och till alla aktieägare som stöder oss. Stort tack!

Jonas Lindvall,
Verkställande direktör
Maha Energy AB

Q4 webbsändning idag kl.16:00 CET

Det kommer att hållas en livepresentation idag den 28 februari kl. 16:00 CET (svensk tid) där bolagets VD Jonas Lindvall och CFO Andres Modarelli kommer att presentera kvartalsrapporten och ge en generell bolagsuppdatering. Länk till webbsändningen finns tillgänglig på bolagets hemsida www.mahaenergy.ca och sändningen visas också live på Nyhetsbyrån Direkts YouTube kanal. Frågor under presentationen ställs direkt i kommentarsfältet på YouTube.

Denna information är sådan information som Maha Energy AB (publ) är skyldigt att offentliggöra enligt EU:s marknadsmissbruksförordning. Informationen lämnades, genom nedanstående kontaktpersons försorg, för offentliggörande den 28 februari 2022, kl. 07:30 CET.

För mer information, kontakta:        
Jonas Lindvall (CEO)
Tel: +46 8 611 05 11        
jonas@mahaenergy.ca

Andres Modarelli (CFO)
Tel: +46 8 611 05 11       
andres@mahaenergy.ca

Victoria Berg (Investor Relations)
Tel: +46 8 611 05 11      
victoria@mahaenergy.ca

Kort om Maha

Maha Energy AB (publ) är ett listat, internationellt uppströmsolje- och gasbolag vars affärsverksamhet inkluderar prospektering, utveckling och produktion av råolja och naturgas. Strategin är att inrikta sig på att utveckla underpresterande kolvätetillgångar på en global basis. Maha är verksam på fyra oljefält, Tartaruga- och Tiefältet i Brasilien samt LAK Ranch och Illinois Basin i USA. Bolagets aktier är listade på Nasdaq Stockholm (MAHA-A). Bolagets huvudkontor ligger i Stockholm, Sverige. Bolaget har även ett tekniskt kontor i Calgary, Kanada, samt operativa kontor i Grayville, Illionis, USA och i Rio de Janeiro, Brasilien. För mer information, vänligen besök vår hemsida www.mahaenergy.ca


1 Periodens resultat för fjärde kvartalet 2020 och helåret 2020 inkluderar en nedskrivning om 21 miljoner USD.

Maha Energy AB Announces Filing of Fourth Quarter 2021 Report & Live Webcast

Maha Energy AB (publ) (“Maha” or the “Company”) is pleased to announce its fourth quarter results. The report is attached to this press release and available on the Company’s website at  www.mahaenergy.ca.

Fourth Quarter 2021

  • Daily oil & gas production for Q4 2021 averaged 3,098 BOEPD (Q4 2020: 2,738 BOEPD)
  • Revenue of USD 17.8 million (Q4 2020: USD 8.7 million)
  • Operating netback of USD 11.9 million or USD 42.37 per BOE (Q4 2020: USD 4.2 million or USD 17.66 per BOE)
  • EBITDA of USD 15.6 million (Q4 2020: USD 2.7 million)
  • Net result of USD 7.4 million (Q4 2020: USD -15.7 million)
  • Basic Earnings per share of USD 0.06 (Q4 2020: USD -0.15)
  • Diluted Earnings per share of USD 0.06 (Q4 2020: USD -0.15)
  • Subsequent to year end, the company announced 24-hour test results of 4,400 BOPD and 1,766 MSCFPD (4,695 BOEPD) on the Tie-4 well using an Electric Submersible Pump (ESP).
  • On January 25th 2022, the Tie-5 Agua Grande (AG) horizontal well in Brazil was spudded.

Full Year 2021

  • Daily oil & gas production for 2021 averaged 3,387 BOEPD (2020: 3,301 BOEPD)
  • Revenue of USD 68.3 million (2020: USD 39.0 million)
  • Operating netback of USD 46.1 million or USD 38.18 per BOE (2020: USD 23.5 million or USD 20.06 per BOE)
  • EBITDA of USD 47.7 million (2020: USD 18.1 million)
  • Net result for the period of USD 21.6 million (2020: USD -10.3 million)
  • Basic Earnings per share of USD 0.19 (2020: USD -0.10)
  • Diluted Earnings per share of USD 0.19 (2020: USD -0.10)
  • Cash and cash equivalents balance of USD 25.5 million (2020: USD 6.7 million)

Financial Summary

(TUSD, unless otherwise noted) Q4 2021 Q3 2021 Q2 2021 Q1
2021
Q4
2020
FY
2021
FY
2020
Net Daily Production (BOEPD) 3,098 3,610 3,104 3,742 2,738 3,387 3,301
Revenue 17,818 19,496 15,178 15,814 8,659 68,306 39,018
Operating netback 11,913 13,568 9,548 11,031 4,247 46,060 23,523
EBITDA 15,615 12,909 8,988 10,213 2,720 47,725 18,104
Net result for the period1 7,363 6,083 2,603 5,538 (15,702) 21,587 (10,259)
Earnings per share – Basic (USD) 0.06 0.05 0.02 0.05 (0.15) 0.19 (0.10)
Earnings per share – Diluted (USD) 0.06 0.05 0.02 0.05 (0.15) 0.19 (0.10)
Cash and cash equivalents 25,535 31,778 34,139 5,698 6,681 25,535 6,681

Letter to shareholders

Tie-4    4,695 BOEPD
After experiencing severe hole problems trying to land the Tie-4 well as a horizontal producer in the Agua Grande (AG) reservoir, it was decided to reconfigure the well to a vertical producer.  Once the well was plugged back and sidetracked, it did not take long to reach the total depth of 2,221 m on December 17th, 2021.  Initial rig based production tests gave preliminary indications of what was to come, and when the new Electric Submersible Pump (ESP) was finally engaged a month later, it quickly became evident that Tie-4 was to become a record well for Maha.  It is the best producing well ever drilled in the Company’s short history, and in Brazil it ranks as the third best well ever drilled onshore Brazil.  In fact, during the testing operations, all but one well had to be temporarily shut in to accommodate the oil production from Tie-4.

Niclas Biornstad, Maha’s Production Manager in Brazil, laughed and said: “We had a little friendly wager going to see who could predict the production rate of Tie-4 before we started the ESP.  One of our Operators, Ronald Santos, came closest by estimating 3,600 BOEPD.” 
The ESP, a first for Maha in the Tie field, was only working at a third of its’ potential power suggesting there is more production available.  But with a rate of 4,695 BOEPD, the production facility was being put through its’ paces.
 
Tie-4 is now hooked up to the Tie production facilities and producing according to plan.  All wells are back on production and the field staff are busy balancing production from all six producers.  

Tie Field
Going forward on the Tie field, the GTE-3 well requires a workover to fix a leak in the tubing.  This well will also be recompleted with an ESP. The ESP allows for greater drawdown of the reservoir, which translates to higher production volumes compared to a hydraulic jet pump.  A drawback of the ESP, however, is that if it breaks it requires a rig assisted intervention, which is costly and takes valuable time.

Furthermore, the Tie-3 well is being converted to a edge water injector to provide important reservoir pressure maintenance.  Reservoir pressure maintenance benefits ultimate oil recovery and reduces gas production from the wells.  Finally, the ALV-2 water injector requires a tubing change to accommodate gas re-injection.

These planned workovers and the planned hook up of the Tie-5 well will affect Tie production volumes during 2022.

Tie-5 – an important horizontal well
The Tie-5 well was spudded on January 25, 2022 and is currently drilling in the main 12-1/4” hole.  Significant changes have been made to the well design to address the drilling obstacles encountered whilst trying to land the Tie-4 well. Changes include; deepening of the 9-5/8” casing shoe, drilling the troublesome Lower Candeias in a shorter section and maintaining a wellbore inclination less than 60 degrees. The Tie-5 well will also be completed using an ESP.

Completion of the Tie-5 well is expected during the second quarter of this year and will provide important spare production capacity to the Tie field.  The 500 meter horizontally completed well will access up to 4 times more oil than a conventional vertical producer. And more importantly, it will also serve as swing producer so that the production plateau can be maintained even if a well goes down for maintenance.

Oman
The Mafraq team have been busy procuring long lead items and services for the upcoming drilling program in Oman.  At the moment, three drilling rigs are being evaluated with a view to start drilling sometime during the second quarter of 2022.

Illinois Basin (IB)
At our IB properties, Hayden Ott and his team have been busy hooking up all the wells drilled last year to production tanks.  At the end of 2021, all wells had been hooked up and all but one were producing oil. Production rates are as expected and although five wells took longer to dewater stimulation fluids than expected, February (to date) average production is 476 BOPD.  The last well, Ford-35-3, is now hooked up to a pump and is showing signs of good oil production as well.

Even though the price of oil is conducive for drilling more wells in IB, the Company will continue to further evaluate production results from the twelve wells drilled during 2021 before deciding on further drilling in 2022. However, two commitment wells will be drilled during the first half of 2022.

Since the oil price collapse of 2014, and the ensuing pandemic of 2020/21, the oil industry has been hit hard.  Capital investment into the industry has suffered and as demand continues to grow unabated, despite calls for the great energy transition, the world is now finding it-self short of oil and gas. Maha is well positioned in this very exciting industry to deliver more barrels and more gas as demand continues to increase. With the addition of Oman, where approximately half of the Company’s future reserves and resources are located, Maha is poised for further growth.  Maha has gone from 1,000 BOEPD in 2017 to 4,275 BOEPD in January, 2022 – and that with a pandemic to boot.

Finally, I wish to thank my fellow Maha colleagues who work so tirelessly for all of us, and to all loyal shareholders who support us.  Thank you!

Yours truly,

Jonas Lindvall
Managing Director

Q4 Webcast today at 16:00 CET

There will be a live webcast today, 28 February at 16:00 CET (Sweden time) to present the quarterly results and provide an operational update. A link to the webcast is available on the Company’s website: www.mahaenergy.ca. Questions posted on the day of the presentation should be made directly in the YouTube Comments/Questions field. The webcast will be broadcast live on Nyhetsbyrån Direkts Youtube Channel and is hosted by Laikas’ Mr. Kaarlo Airaxin, and will feature Maha’s CEO Jonas Lindvall and CFO Andres Modarelli.

This information is such information as Maha Energy AB (publ) is obliged to make public pursuant to the EU Market Abuse Regulation. The information was submitted for publication, through the agency of the contact person set out below, at 07:30 CET on 28 February, 2022.

For more information, please contact:        
Jonas Lindvall (CEO)
Tel: +46 8 611 05 11        
jonas@mahaenergy.ca

Andres Modarelli (CFO)
Tel: +46 8 611 05 11       
andres@mahaenergy.ca

Victoria Berg (Investor Relations)
Tel: +46 8 611 05 11      
victoria@mahaenergy.ca

About Maha
Maha Energy AB (publ) is a listed, international upstream oil and gas company whose business activities include exploration, development and production of crude oil and natural gas. The strategy is to target and develop underperforming hydrocarbon assets on global basis. Maha operates four oil fields: Tartaruga and Tie in Brazil, Powder River (LAK Ranch) and Illinois Basin in the United States. The shares are listed on Nasdaq Stockholm (MAHA-A). The head office is in Stockholm, Sweden with a technical office in Calgary, Canada, as well as operations offices in Grayville, Illinois, USA and Rio De Janeiro, Brazil. For more information, please visit our website www.mahaenergy.ca


1 Net result of Q4 2020 and full year 2020 includes an impairment charge of USD 21.0 million.

Maha Energy announce December 31, 2021 Reserve and Resource Report

Chapman Petroleum Engineering Ltd. (“Chapman”) has completed their annual reserve and resource determination for Maha Energy AB (publ) (“Maha” or the “Company”). The Company’s (“2C”) Contingent Resources volumes have increased by 49%, the Proven plus Probable reserves (“2P”) and 2C Contingent Resources volume are up by 2%. The 2P reserve volumes are down by 23% compared to the previous year. The reduction in 2P reserves does not affect the Company’s near to medium term production volumes, nor the resulting cashflows. The Company’s 2022 production guidance of 4,000 – 5,000 BOEPD remains.

The results of the recently tested (post December 31, 2021) and very positive Tie-4 well have not been included in the 2021 reserves and resource update and are expected to be included as part of the 2022 reserve and resource volumes.

The 2021 reserves are impacted by the 2021 drilling and testing results of the Tartaruga-3 well, produced volumes in Brazil and USA, seismic and reservoir modelling revisions at the Tie field in Brazil, as well as non-core lease relinquishments in USA. In Oman, both 2P reserves and 2C Contingent Resources have increased significantly due to seismic and petrophysical evaluations conducted during 2021. 

Maha Reserves and Resources1 as of 31 December, 2021

2021 Maha Energy AB Company Gross Reserves before income tax
(million barrels)
  Tie Tartaruga2 Illinois Basin Oman LAK Total
1P 9.06 6.28 1.83 0.47 0.11 17.75
2P 12.68 8.64 3.34 1.52 8.81 34.99
3P 15.00 10.93 3.52 2.47 14.24 46.17

2021 Maha Energy AB Company Gross Conventional (Sales) Natural Gas Reserves before income tax
(billion Standard Cubic Feet)
  Tie Tartaruga2 Illinois Basin Oman LAK Total
1P 6.54 3.07       9.62
2P 9.15 4.23       13.38
3P 10.83 5.36       16.19

Resource Category
‘Mafraq” Block 70 Oman
2021 Volume
(million barrels)
1C 23.59
2C 33.41
3C 60.32

[1] Volumes are Gross Working Interest volumes and are expressed before royalties, Government allocations and taxes.
2 The Tartaruga Concession Agreement expires in 2025 but provides mechanisms for extension based on the continued productivity of the field. Management is confident that such an extension will be approved, and Chapman has classified the recoverable volumes as reserves based on these mechanisms. Maha has a 75% Working Interest in the Tartaruga concession.
3 Chapman Petroleum Engineering Ltd. uses the following oil price forecast for Brent Spot in $USD/STB:

2022 2023 2024 2025 2026 2027 2028
$76.44 $73.84 $72.28 $73.73 $75.20 $76.70 $78.24

The average gas price for the gas reserves at Tie Field over the next five years is forecasted by Chapman to be around $1.00 USD/MSCF.

The reserves review and issuance of this reserve report for the Company was made by the independent petroleum engineering consultants Chapman Petroleum Engineering Ltd., Calgary, Canada. The evaluation was carried out in accordance with standards set out in the Canadian Oil and Gas Evaluation Handbook, the professional practice standard under their Permit to Practice with APEGA and under the guidelines of the European Securities and Markets Authority (ESMA). The report has been prepared and supervised by a “Qualified Reserves Evaluator”.

Maha Energy AB, through its subsidiaries owns and operates a legal and beneficial 75% Working Interest (WI) in the SES-107D Block (Tartaruga) onshore Sergipe State Brazil, a 99% WI in the LAK Ranch heavy oil field in Wyoming USA, a 100% Working Interest (WI) in the Tie Field onshore Bahia State Brazil, an initial 100% WI in the Block 70 Mafraq field under the Exploration and Production Sharing Agreement with the Government of Oman and approximately 96% WI in the acreage in the Illinois Basin.

This information is such information as Maha Energy AB (publ) is obliged to make public pursuant to the EU Market Abuse Regulation. The information was submitted for publication, through the agency of the contact person set out below, at 13:15 CET on 31 January, 2022.

For more information, please contact:        
Jonas Lindvall (CEO)
Tel: +46 8 611 05 11      
jonas@mahaenergy.ca

Victoria Berg (Investor Relations)
Tel: +46 8 611 05 11      
victoria@mahaenergy.ca

About Maha
Maha Energy AB (publ) is a listed, international upstream oil and gas company whose business activities include exploration, development and production of crude oil and natural gas. The strategy is to target and develop underperforming hydrocarbon assets on global basis. Maha operates four oil fields: Tartaruga and Tie in Brazil, Powder River (LAK Ranch) and Illinois Basin in the United States.The shares are listed on Nasdaq Stockholm (MAHA-A). The head office is in Stockholm, Sweden with a technical office in Calgary, Canada, as well as operations offices in Grayville, Illinois, USA and Rio de Janeiro, Brazil. For more information, please visit our website www.mahaenergy.ca.

Maha Energy meddelar reserv- och resursrapport per 31 december 2021

Chapman Petroleum Engineering Ltd. (“Chapman”) har genomfört den årliga utvärderingen av Maha Energy AB:s (publ) (”Maha” eller ”Bolaget”) olje- och gasreserver och resurser. Bolagets (2C) betingade resurser ökade med 49 procent. Bevisade och sannolika reserver (2P) plus 2C betingade resurser ökade med 2 procent. 2P volymerna minskade däremot med 23 procent i jämförelse med föregående år. Minskningen av Bolagets 2P reserver påverkar inte produktionsvolymer eller kassaflöde på kort till medellång sikt. Produktionsguidningen för 2022 om 4 000 – 5 000 BOEPD kvarstår.

Resultaten från den nyligen produktionstestade brunnen Tie-4 som översteg förväntan är inte inkluderad i reserv- och resursrapporten för 2021 eftersom resultaten meddelades efter årsskiftet. Dessa resultat förväntas inkluderas i reserv- och resursrapporten för 2022.

Volymerna i reserv- och resursrapporten för 2021 påverkades av; borr- och testresultat från brunnen Tartaruga-3, producerad olja och gas från Brasilien och USA, reviderade seismisk- och reservoartolkningar på Tiefältet i Brasilien samt uppsägning av icke-kärnområden i Illinois Basin, USA. I Oman ökade både 2P-reserver och 2C betingade resurser signifikant tack vare utvärdering av ny seismisk- och petrofysiskdata.

Mahas reserver och resurser per 31 december 2021

2021 Maha Energy AB bruttoreserver före skatt
(miljoner fat)
  Tie Tartaruga2 Illinois Basin Oman LAK Total
1P 9,06 6,28 1,83 0,47 0,11 17,75
2P 12,68 8,64 3,34 1,52 8,81 34,99
3P 15,00 10,93 3,52 2,47 14,24 46,17

2021 Maha Energy AB brutto försäljningsbar naturgas före skatt
(miljarder standard kubikfot)
  Tie Tartaruga2 Illinois Basin Oman LAK Total
1P 6,54 3,07       9,62
2P 9,15 4,23       13,38
3P 10,83 5,36       16,19

Resurs kategori
‘Mafraq” Block 70 Oman
2021 Volym
(miljoner fat)
1C 23,59
2C 33,41
3C 60,32

1Avser bruttovolymer av arbetsintresseandelar till Maha Energy AB men innan eventuella royalties, statlig allokering, och skatter.
2Avtalet för Tartaruga-koncessionen går ut i slutet av 2025, men ger möjlighet till förlängning så länge oljefältet är i produktion och med myndigheters godkännande. Då bolaget bedömer möjligheten till förlängning som mycket sannolik har reserverna på Tartaruga-fältet inkluderat framtida produktion baserat på en förlängning. Maha har 75 procent av arbetsintresseandelar i Tartaruga-licensen.
3Chapman Petroleum Engineering Ltd. använder följande oljeprisutveckling för Brentoljan USD/fat olja:            

2022 2023 2024 2025 2026 2027 2028
$76,44 $73,84 $72,28 $73,73 $75,20 $76,70 $78,24

Chapmans antagna snittpris för de kommande 5 åren av naturgasreserver på Tiefältet är $1,00 USD/MSCF.

Denna oberoende redovisning av reserver och resurser har gjorts av Chapman Petroleum Engineering Ltd., Calgary, Kanada för Bolagets räkning. Utvärderingen har genomförts i enlighet med de riktlinjer och standarder som återfinns i “Canadian Oil and Gas Evaluation Handbook”, samt i “The professional practice standard under our Permit to Practice with APEGA” och slutligen i ”The Guidelines of the European Securities and Markets Authority” (ESMA). Rapporten har sammanställts och översetts av en “Qualified Reserves Evaluator”.

Genom dotterbolag äger och styr Maha Energy AB, 75 procent av intresseandelarna i SES-107D Blocket (Tartaruga) onshoredelstaten Sergipe, Brasilien,  99 procent av intresseandelarna i  LAK Ranch tungoljefältet i Wyoming, USA, 100 procent av intresseandelarna i Tie-fältet onshoredelstaten Bahia, Brasilien, 100 procent av intresseandelarna i Block 70 Mafraq som styrs av ett produktionsdelningsavtal med den Omanska Staten samt cirka 96 procent av intresseandelarna i ett flertal oljeproducerande fält och formationer i Illinois Basin, USA.

Denna information är sådan information som Maha Energy AB (publ) är skyldigt att offentliggöra enligt EU:s marknadsmissbruksförordning. Informationen lämnades, genom nedanstående kontaktpersons försorg, för offentliggörande den 31 januari 2022 kl. 13:15 CET.

För mer information, kontakta:        
Jonas Lindvall (CEO)
Tel: +46 8 611 05 11        
jonas@mahaenergy.ca

Victoria Berg (Investor Relations)
Tel: +46 8 611 05 11      
victoria@mahaenergy.ca

Kort om Maha

Maha Energy AB (publ) är ett listat, internationellt uppströmsolje- och gasbolag vars affärsverksamhet inkluderar prospektering, utveckling och produktion av råolja och naturgas. Strategin är att inrikta sig på att utveckla underpresterande kolvätetillgångar på en global basis. Maha är verksam på fyra oljefält, Tartaruga- och Tiefältet i Brasilien samt LAK Ranch och Illinois Basin i USA. Bolagets aktier är listade på Nasdaq Stockholm (MAHA-A). Bolagets huvudkontor ligger i Stockholm, Sverige. Bolaget har även ett tekniskt kontor i Calgary, Kanada, samt operativa kontor i Grayville, Illionis, USA och i Rio de Janeiro, Brasilien. För mer information, vänligen besök vår hemsida www.mahaenergy.ca

Maha Energy announce spud of Tie-5

Maha Energy AB (publ) (“Maha” or the “Company”) is pleased to announce the spud of the Tie-5 Agua Grande (AG) horizontal well in Brazil. The Tie-5 well was spudded on time as per planned schedule at 0900 (GMT-3) on January 25th on the Tie field in Brazil. The well is designed as a horizontal well and will drain the northern part of the Tie field at the Agua Grande level.

As communicated earlier, the Tie-4 well was completed as a vertical producer and tested 4,695 BOEPD on an Electrical Submersible Pump (ESP). The Tie-4 well is now producing through the Tie Production Facility.

Jonas Lindvall, CEO of Maha Energy comments: ”In light of the very positive well performance of Tie-4, we are very excited to start drilling the Tie-5 well.  Our drilling team in Brazil have significantly improved on the Tie-4 well design and I am confident that we will be able to land the well horizontally in the AG.”

Significant changes have been made to the Tie-5 well design to address the drilling issues encountered whilst trying to land the previous Tie-4 well. Changes include, deepening of the 9-5/8” casing shoe, and drilling the troublesome Lower Candeias in a shorter section with an inclination below 60 degrees. The Company has successfully drilled multiple wells through the Lower Candeias at angles below 60 degrees. A new geomechanical study was  carried out with data acquired in Tie-4, and its findings and recommendations have been incorporated into the well program. Tie-5 will also be completed using an ESP.

1   Barrels of oil equivalent ("BOE") conversion ratio of 6,000 scf: 1 bbl is used.

Miscellaneous
The information was submitted for publication, through the agency of the contact persons set out below, at 12:00 CET on 26 January 2022.

For more information, please contact:        
Jonas Lindvall (CEO)
Tel: +46 8 611 05 11        
jonas@mahaenergy.ca

Victoria Berg (Investor Relations)
Tel: +46 8 611 05 11      
victoria@mahaenergy.ca

About Maha
Maha Energy AB (publ) is a listed, international upstream oil and gas company whose business activities include exploration, development and production of crude oil and natural gas. The strategy is to target and develop underperforming hydrocarbon assets on global basis. Maha operates four oil fields: Tartaruga and Tie in Brazil, Powder River (LAK Ranch) and Illinois Basin in the United States. The shares are listed on Nasdaq Stockholm (MAHA-A). The head office is in Stockholm, Sweden with a technical office in Calgary, Canada, as well as operations offices in Grayville, Illinois, USA and Rio De Janeiro, Brazil. For more information, please visit our website www.mahaenergy.ca

Maha Energy har påbörjat borrningen av Tie-5

Maha Energy AB (publ) (”Maha” eller ”Bolaget”) meddelar att borrningen av Tie-5 i Brasilien har påbörjats. Borrkronan sattes i backen enligt tidplan klockan 09.00 (-3 GMT) lokal tid igår på Tiefältet i Brasilien. Planen är att Tie-5 ska bli en horisontal produktionsbrunn mot den norra delen av reservoaren Agua Grande (AG).

Som tidigare kommunicerats är den vertikala Tie-4 brunnen nu kopplad till produktionsanläggningen och producerade 4 695 BOEPD1 under ett 24-timmarstest. 
Tie-4 färdigställdes med en elektrisk nedsänkbar pump (ESP).

Jonas Lindvall, VD för Maha Energy kommenterar: ”Med tanke på det fina resultatet från Tie-4 brunnen så är vi väldigt entusiastiska över borrstarten på Tie-5. Vårt borrteam i Brasilien har gjort väsentliga förbättringar av borrplanen och jag är övertygad om att vi kommer att nå vårt mål att få ett horisontellt hål i AG-reservoaren.”

De har gjorts betydande förändringar av borrplanen för Tie-5 för att undvika de problem som påträffades vid borrningen på Tie-4 i höstas. Exempelvis sätts 9-5/8 tums foderrör betydligt djupare och borrningen genom den ostabila L. Candais-formationen minimeras med en borrvinkeln under 60 grader. Maha har tidigare framgångsrikt genomborrat L. Candais formationen på ett flertal ställen med en borrvinkel under 60 grader. Vidare har en geomekanisk studie på L. Candais-formationen utförts baserat på information från
Tie-4 vilken har inkorporerats i borrplanen. Tie-5 kommer också färdigställas med en ESP.

1 BOEPD: Likvärdig i oljefat per dag; 6 000SCF = 1 fat olja.

Informationen lämnades, genom nedanstående kontaktpersoners försorg, för offentliggörande den 26 januari 2022, kl.12:00 CET.

För mer information, kontakta:        
Jonas Lindvall (CEO)
Tel: +46 8 611 05 11        
jonas@mahaenergy.ca

Victoria Berg (Investor Relations)
Tel: +46 8 611 05 11      
victoria@mahaenergy.ca

Kort om Maha

Maha Energy AB (publ) är ett listat, internationellt uppströmsolje- och gasbolag vars affärsverksamhet inkluderar prospektering, utveckling och produktion av råolja och naturgas. Strategin är att inrikta sig på att utveckla underpresterande kolvätetillgångar på en global basis. Maha är verksam på fyra oljefält, Tartaruga- och Tiefältet i Brasilien samt LAK Ranch och Illinois Basin i USA. Bolagets aktier är listade på Nasdaq Stockholm (MAHA-A). Bolagets huvudkontor ligger i Stockholm, Sverige. Bolaget har även ett tekniskt kontor i Calgary, Kanada, samt operativa kontor i Grayville, Illionis, USA och i Rio de Janeiro, Brasilien. För mer information, vänligen besök vår hemsida www.mahaenergy.ca

Mahas brunn Tie-4 testar 4 695 BOEPD kopplad till produktionsanläggning

Maha Energy AB (publ) ("Maha" eller "Bolaget") meddelar att den nyligen färdigställda brunnen Tie-4 nu är kopplad till den permanenta produktionsanläggningen och har testats under 24 timmar med en elektrisk nedsänkbar pump (ESP).  Resultatet var 4 400 fat olja om dagen och
1 766 MSCF gas om dagen (4 695 BOEPD1) med ett stabilt brunnshuvudtryck om 220 psi. Produktionsguidningen om 4 000 – 5 000 BOEPD för 2022 kvarstår.

Jonas Lindvall, VD för Maha kommenterar: ”Produktionstestet för Tie-4 genom produktionsanläggningen på Tiefältet är nu slutfört. Flödet från brunnen var så starkt att vi under testet var tvungna att temporärt stänga ner andra produktionsbrunnar. Vi behövde också mobilisera extra tankbilar för att snabbt kunna transportera bort oljan. Vi är mycket nöjda med resultatet, det visar återigen den höga kvaliteten på Tiefältet och speciellt hur produktiva reservoarerna Agua Grande och Sergi är.”

Jonas Lindvall fortsätter: ”Vi kommer nu att strypa flödet från Tie-4 för att balansera reservoarer-trycket över Tie-fältets alla produktionsbrunnar. Detta ger oss viktig extra leveranskapacitet på Tie-fältet samt en jämn trycksänkning över reservoarerna. Det är för tidigt att bedöma hur dessa resultat kan påverka årliga produktionsvolymer.”

Tie-4
Brunnen Tie-4 (7-TIE-4HE-BA) har nu kopplats in på produktionsanläggning på Tiefältet.  Produktion från reservoarerna Agua Grande (AG) och Sergi (SG) samproduceras genom en 3,5 tums ESP. Resultat från det initiala 24-timmars flödestestet:   

Oljeproduktion: 4 400 BOPD
Vattenproduktion: 64 BWPD
Gasproduktion: 1 766 MSCFPD
BOEPD: 4 695 BOEPD
Brunnshuvudtryck: 220 psi

Tie-5
Det har gjorts betydande ändringar av brunnsprofilen för att undvika de problem som påträffades under borrningen på Tie-4. Planen är att Tie-5 ska bli en horisontal produktionsbrunn mot den norra delen av reservoaren Agua Grande. Även här kommer en ESP användas. En borrigg har flyttats från Tie-4 till Tie-5 och driftsättningen är under färdigställande. Borrningarna på Tie-5 är planerade att påbörjas under de närmsta två veckorna.

1 BOEPD: Likvärdig i oljefat per dag; 6 000SCF = 1 fat olja.

Denna information är sådan information som Maha Energy AB (publ) är skyldigt att offentliggöra enligt EU:s marknadsmissbruksförordning. Informationen lämnades, genom nedanstående kontaktpersons försorg, för offentliggörande den 20 januari 2022, kl. 21:15 CET.

För mer information, kontakta:        
Jonas Lindvall (CEO)
Tel: +46 8 611 05 11        
jonas@mahaenergy.ca

Victoria Berg (Investor Relations)
Tel: +46 8 611 05 11      
victoria@mahaenergy.ca

Viktig Information
Rapporterade testproduktionsnivåer som anges i detta pressmeddelande återspeglar inte nödvändigtvis permanenta och hållbara produktionsvolymer. Framtida produktionsvolymer kan skilja sig från testproduktionsvolymerna som redovisats i detta pressmeddelande, bland annat, på grund av att reservoaren sinar naturligt, vatten- och /eller gasintrång, sandproduktion, pumphaveri eller driftbrott och produktionsavbrott som uppstår under en permanent produktionsverksamhet.

Kort om Maha

Maha Energy AB (publ) är ett listat, internationellt uppströmsolje- och gasbolag vars affärsverksamhet inkluderar prospektering, utveckling och produktion av råolja och naturgas. Strategin är att inrikta sig på att utveckla underpresterande kolvätetillgångar på en global basis. Maha är verksam på fyra oljefält, Tartaruga- och Tiefältet i Brasilien samt LAK Ranch och Illinois Basin i USA. Bolagets aktier är listade på Nasdaq Stockholm (MAHA-A). Bolagets huvudkontor ligger i Stockholm, Sverige. Bolaget har även ett tekniskt kontor i Calgary, Kanada, samt operativa kontor i Grayville, Illionis, USA och i Rio de Janeiro, Brasilien. För mer information, vänligen besök vår hemsida www.mahaenergy.ca

Maha’s Tie-4 well tests 4,695 BOEPD through Tie Permanent Facilities

Maha Energy AB (publ) (“Maha” or the “Company”) is pleased to announce that the recently completed Tie-4 well is now tied into the permanent production facilities and has been placed on a 24-hour test using an Electric Submersible Pump (ESP). The results were 4,400 BOPD and 1,766 MSCFPD (4,695 BOEPD1) with a stable tubing-head flowing pressure of 220 psi. The annual average production guidance of 4,000 – 5,000 BOEPD for 2022 remains.

Jonas Lindvall, CEO of Maha commented; “Testing of the Tie-4 well through the permanent production facilities is now completed. The well came on so strong we had to shut other wells in to accommodate the test volumes and additional oil trucks had to be mobilized. We are very pleased with the outcome. Again, the results demonstrate the top quality of the Tie field and the prolific nature of the Agua Grande and Sergi reservoirs.”

Mr. Lindvall continued: “We will now optimize oil production across all the Tie wells so that reservoir drawdown is evenly distributed across the field. The Tie-4 well will be choked back and will provide important future production redundancy. It is premature to assess how these results may affect annual production volumes.”

Tie-4
The Tie-4 well (7-TIE-4HE-BA) has now been tied into the permanent production facilities at Tie.  Both the Agua Grande (AG) and Sergi (SG) zones are perforated and are now comingled in a 3 ½” single tubing completion with an ESP. Initial stabilized well test results over a 24 hour period are as follows:

Oil Production: 4,400 BOPD
Water Production: 64 BWPD
Gas Production: 1,766 MSCFPD
BOEPD: 4,695 BOEPD
Flowing Wellhead Pressure: 220 psi

Tie-5
Significant changes have been made to the well design that should address the problems encountered on the Tie-4 well. The Tie-5 well is designed as a horizontal production well targeting the northern part of the AG reservoir. An ESP will also be run on this well. A drilling rig has been moved from the Tie-4 location to Tie-5 and rig up and commissioning is almost complete. The drilling of Tie-5 is slated to start within two weeks.

1 BOEPD : Barrels of Oil Equivalent per Day; 6,000 SCF = 1 barrel of oil

This information is such information that Maha Energy AB (publ) is obliged to make public pursuant to the EU Market Abuse Regulation. The information was submitted for publication, through the agency of the contact person set out below, 21:15 CET on 20 January, 2022.

For more information, please contact:        
Jonas Lindvall (CEO)
Tel: +46 8 611 05 11        
jonas@mahaenergy.ca

Victoria Berg (Investor Relations)
Tel: +46 8 611 05 11      
victoria@mahaenergy.ca

Important Notice
Reported test production levels stated in this Press Release may not be reflective of permanent sustainable production rates and future production rates may differ materially from the test production rates reflected in this news release due to, among other factors, natural decline, water and/or gas coning, sand production, pump breakdowns or difficulties and surface interruptions encountered during permanent production operations.

About Maha
Maha Energy AB (publ) is a listed, international upstream oil and gas company whose business activities include exploration, development and production of crude oil and natural gas. The strategy is to target and develop underperforming hydrocarbon assets on global basis. Maha operates four oil fields: Tartaruga and Tie in Brazil, Powder River (LAK Ranch) and Illinois Basin in the United States. The shares are listed on Nasdaq Stockholm (MAHA-A). The head office is in Stockholm, Sweden with a technical office in Calgary, Canada, as well as operations offices in Grayville, Illinois, USA and Rio De Janeiro, Brazil. For more information, please visit our website www.mahaenergy.ca